Home > Single Post

EPDM Rubber Granule Flooring Installation – Step-by-Step Guide for Contractors

Lanhe Floor

need any help ?

Phone

+86 17366625375

Email

info@lanhelfoor.com

Work Hours

Mon - Fri : 09:00 AM – 18:00 PM

Subscribe for our latest article

Follow us :

EPDM Rubber Granule Flooring Installation – Step-by-Step Guide for Contractors

Installing safe, colorful, and long-lasting EPDM flooring may look simple — but every step matters.

From school playgrounds to rehab walkways, one mistake during installation can mean rework, complaints, or even injuries.

This guide walks you through surface prep, binder ratios, layering method, and curing tips — everything you need for a clean, professional finish.

Worker installing colorful EPDM rubber flooring with trowel on concrete base


✅ Step 1: How Should You Prepare the Ground?

A strong and clean base is the foundation of a durable EPDM surface.

EPDM should be installed on a solid, dry, and clean concrete or asphalt base with proper drainage to avoid bubbling or cracking.

Worker sweeping concrete surface to prepare for EPDM flooring installation

Surface Preparation Checklist

TaskRequirement
Base typeConcrete / Asphalt
Surface conditionClean, oil-free, dust-free
LevelingSlope deviation ≤ 3mm
Moisture controlMust be 100% dry

💡 Tip: Delay installation if rain occurred within 24–48 hours.


✅ Step 2: What Is the Right Mixing Ratio?

The binder ratio affects softness, durability, and color clarity.

Use a typical weight ratio of 4:1 to 6:1 (EPDM : PU Binder) — depending on the area type and comfort level required.

👉 See PU binder spec – ASTM D624

Industrial mixer with blue EPDM granules and PU binder

Suggested Ratios by Area

Application AreaEPDM : PU Binder
Kindergarten playground5:1
Community path6:1
Rehab center trail4:1
Logo / pattern zones4:1

🌀 Mix thoroughly for 2–3 minutes and pour immediately. No batch waiting!


✅ Step 3: What Are the Installation Steps?

EPDM flooring is poured in place — like building a cake with layers.

Optional cushion → EPDM surface → steel trowel finish.

Leveling freshly poured EPDM rubber flooring

Layer-by-Layer Instruction

LayerMaterialThicknessTime Control
Cushion LayerSBR + PU binder5–10mmUse within 30 min
Surface LayerEPDM + PU binder10–15mmTrowel in 30 min
CuringAir-dry24–48 hrs
  • Trowel evenly in all directions
  • Avoid over-compression (may affect drainage or bounce)
  • Best temp: above 10°C

⚠️ Step 4: What Should You Watch Out for?

One wrong move = color mismatch, lifting surface, or cracks in weeks.

Colorful EPDM rubber flooring in school playground

Common Installation Mistakes

  • 🌧️ Don’t install with rain forecast within 48 hrs
  • 🧪 Only mix what you’ll use in 30 mins
  • 🎨 Use same batch granules per zone to avoid color difference
  • ❄️ Extend curing time if cold or humid
  • 📏 Keep thickness even for EN1177 compliance

👉 Want to see real results? Visit our Project Gallery


🧠 Conclusion

EPDM rubber flooring is a safe, high-performance surface — only if installed right.

From base prep to binder ratio, every detail affects durability and safety.


📞 Ready to Build a Long-Lasting Playground or Outdoor Track?

Get expert support from Lanhefloor’s factory team — including binder sourcing, equipment tips, and mixing guides.

👉 Request a Free Quote or Sample
📧 info@lanhefloor.com | 📱 WhatsApp: +86 18758325375


🔗 Related Blog Posts

#EPDMInstallation #PlaygroundSafety #RubberFlooring #Lanhefloor #BinderRatio #ConstructionTips

Get in touch

Send us message if any needs, we will reply you within 24hours