Home > Single Post

Top Mistakes to Avoid When Installing Rubber Flooring

Lanhe Floor

need any help ?

Phone

+86 17366625375

Email

info@lanhelfoor.com

Work Hours

Mon - Fri : 09:00 AM – 18:00 PM

Subscribe for our latest article

Follow us :

Top Mistakes to Avoid When Installing Rubber Flooring?

Rubber flooring is a popular choice for gyms and playgrounds—but if installed wrong, it can become a costly mistake.

To avoid problems like buckling, uneven seams, or shortened product life, you must follow correct installation steps for your rubber flooring.

Top mistakes to avoid when installing rubber flooring

One mistake during installation can affect the safety, look, and durability of your entire space. I’ve seen it happen too often, especially when customers try to save on labor or skip important prep steps. Let’s go through the most common errors and how to avoid them.

Did You Prepare the Subfloor Properly?

Skipping subfloor preparation is the fastest way to ruin your installation.

Rubber flooring must be installed on a smooth, clean, and dry surface. Any dust, moisture, or unevenness can lead to peeling, cracking, or water damage.

Why Subfloor Preparation Matters

If you’re using rubber tiles or rubber rolls from Lanhefloor, especially our composite tiles or tiny granule tiles, a bad subfloor can ruin their full performance. Here’s what proper prep involves:

StepWhat to DoWhy It Matters
1Clean thoroughlyRemove dust, oil, and debris
2Check for moistureWater under rubber = mold and odor
3Level the floorUneven areas cause tiles to shift or gaps to form
4Allow curing (for concrete)New slabs need at least 28 days before install

Whether it’s a heavy lifting zone or a yoga area, the foundation is key to durability.

Are You Using the Right Adhesive or Tape?

Wrong adhesive choice can cause tiles to come loose or curl at the edges.

Each type of rubber floor—tiles, rolls, interlocking—needs the right glue or tape based on its use and your layout.

Choosing the Correct Method

Let’s look at the most suitable installation methods for Lanhefloor’s products:

Product TypeSuggested MethodNotes
Tiny Granules Rubber TileGlue-downIdeal for permanent weight zones
Composite Rubber TileGlue-downEPDM surface needs strong bond
Interlocking TileNo glue requiredBest for flexible setups
Rubber RollDouble-sided tape or glueUse tape for easy replacement, glue for high-traffic

Avoid cheap construction glue—it doesn’t bond well to rubber and can break down under heavy use.

Did You Let the Rubber Acclimate?

Installing rubber flooring straight from the pallet is a rookie error.

Rubber needs 24–48 hours to acclimate to the room temperature and humidity. Skip this, and the flooring might expand or contract after install.

Why Acclimation Matters

Rubber is temperature-sensitive. In cold conditions, it shrinks. In hot spaces, it expands. Especially in places like Australia or the Middle East, where customers like Mark often build gyms in metal buildings, this step is critical.

Unroll or unpack the rubber, lay it flat in the install room, and leave it for 1–2 days. This helps avoid future warping or edge curling.

Did You Align the Tiles or Rolls Correctly?

A mismatched layout destroys the professional look of your floor.

Rubber tiles and rolls must be aligned in one direction and installed in a staggered pattern to avoid visible seams.

Planning Layout Before Gluing

A few layout tips I always give my clients before installation:

  • Dry lay the first few rows
  • Use chalk lines to keep direction consistent
  • For tiles, rotate each tile the same way—especially important for composite tiles with a laminated surface
  • Stagger joints to spread pressure evenly

This applies to all sizes, from 500×500mm up to 1000×1000mm tiles. See real-world results in our project gallery.

Did You Use the Right Thickness for the Area?

Wrong thickness leads to premature damage or uncomfortable use.

Different gym zones require different rubber thicknesses. Heavy weight areas need 20mm or more; light-use areas can use thinner rubber rolls.

rubber thickness for gyms

Match Thickness to Usage

Here’s a quick guide from our Lanhefloor application matrix:

ZoneRecommended ThicknessProduct Options
Free Weight Area20–50mmTiny Granules Tile, Composite Tile
Functional/HIIT Zone15–25mmInterlocking Tile
Yoga/Cardio/Office4–12mmRubber Roll
Playground25–50mmOutdoor Rubber Tile, EPDM Granules

Using 10mm tiles in a heavy weight zone? That’s a disaster waiting to happen. Protect your investment by choosing the right spec.

Are You Rushing the Installation?

Fast install sounds good—until the floor starts to peel or shift.

Give each step enough time: adhesive curing, acclimation, layout planning. Rushing causes long-term issues.

Time Is Part of Quality

Clients like Sean in Spain often have tight deadlines. But I’ve always recommended building in a buffer. Allow:

  • 24h acclimation
  • 48h curing for adhesives
  • Post-install rest time before use (at least 24h)

Especially for commercial projects, these extra hours save months of trouble. For long-term safety and performance, take a look at our complete flooring solutions.

Conclusion

Avoiding these common rubber flooring mistakes helps your install last longer, look better, and perform safely.

free samples here for you